.. _contribute_release:

Release Procedure
=================

The ZOO-Project release procedure is commonly defined by the following
rules:

* Any of the :ref:`zoo_developers` can ask for a release by asking the
  :ref:`zoo_psc` and pointing a release manager. This last will then
  vote for accepting both the manager and the release procedure to
  happen.
* If not already created, create  a wiki page (like this `this one
  <http://zoo-project.org/trac/wiki/Release/1.3.0/Notes>`_ using this
  scheme: Release/M.m.r/Notes), summarizing changes from the previous
  release (extracted from the `revision log
  <http://zoo-project.org/trac/browser/trunk/zoo-project/HISTORY.txt>`_).
* That file should include new features, changed features, and
  deprecated features if any. Changes to the official documentation
  should be specifically noted along with other items that will cause
  breaking changes during upgrades. 
* Read the documentation and remove outdated parts.
* Create release candidate as .zip and .tar.bz2  then add them on this
  `page <http://zoo-project.org/site/Downloads>`_ (by editing this
  `wiki page <http://zoo-project.org/trac/wiki/Download>`_)
* Cut a release candidate once you think that everything is in
  order. Announce the release candidate for review for at least 1
  week. In this period of time, it is also appropriate for you to
  deploy in production since you are asserting that it is stable and
  (significant) bug free. Publish a specific revision with this.
* If significant bugs are reported, fix and cut a new release
  candidate. If no major bugs, then announce that the release
  candidate has officially been promoted to the official release (if
  you want, you can do this with a motion and support of the PSC).
* Ensure that release exactly matches something in SVN. Tag and branch
  appropriately.
* Update documentation as needed.
* Announce on various email list and other locations
  (news_item@osgeo.org, SlashGeo, etc)

Creating an Official Release
----------------------------

Release versions lead to an update in documentation and standard tarballs. This is to help future administrators repeatably create releases.

* Double check that the pages from `the ZOO-Project.org web site <http://zoo-project.org/>`_ match the current version.
* Double check that the latest build file matches the current revisions number.
* If this is a new major release create a branch and a tag.

.. code::

    cd zoo-project-svn/
    svn cp trunk branches/branch-1.6
    svn cp trunk tags/rel-1.6.0

* If this is a major or minor relase, create a tag.

.. code::

    svn cp branches/branch-1.6 tags/rel-1.6.1

* Commit the tags or branches with the version numbers.

.. code::

    svn commit -m 'Created branch/tags for the X.Y.Z release'

* Create version archives

.. code::

    export VERSION=2.6.0
    cd zoo-propject-svn
    cp -r trunk zoo-project-$VERSION
    cd zoo-project-$VERSION
    rm -rf $(find ./ -name ".svn") 
    cd zoo-project/zoo-kernel
    autoconf
    cd ../../..
    # Remove documentation from the archive
    rm -rf ./zoo-project-$VERSION/docs
    tar -cvjf ./zoo-project-$VERSION.tar.bz2 ./zoo-project-$VERSION
    zip -r ./zoo-project-$VERSION.zip ./zoo-project-$VERSION
    scp -P 1046 ./zoo-project-$VERSION.{zip,tar.bz2} zoo-project.org:/var/www/localhost/htdocs/dl/

* Update the `Downloads page <http://zoo-project.org/site/Downloads>`_ to add the latest release (by editing `this wiki page <http://zoo-project.org/trac/wiki/Downloads>`_).
