| 20 | 5 ZOO-PSC members attended this meeting. |
| 21 | |
| 22 | * ZOO-Kernel-1.2.0rc1 release status |
| 23 | |
| 24 | Comments was made about releasing the 1.2.0-rc1. Jeff proposed his help for this task. Testing suite was mentioned and was postponed for future releases. |
| 25 | |
| 26 | * ZOO-Docs release status : |
| 27 | |
| 28 | All the Sphinx setup was made by Jeff, scripts which have to be used as cron job was also produced to automate documentation production on the server. The specific case of the JavaScript documentation (using Naturaldocs) was mentioned but the ZOO-API documentation will still be ported to Sphinx restructured text. |
| 29 | |
| 30 | The PSC next meeting should be fixed through email. |
| 31 | |
| 32 | As it was really late, the metting was then closed before we got time to treat the third point about .deb packaging. |
| 33 | |
| 34 | IRC logs are available from here : [http://zoo-project.org/irclogs/zoo-psc-201104.log]. |